Bathroom Remodeling by Palm Beach Renovations

Bathroom Remodeling in Palm Beach & Martin County, FL

From small powder rooms to spa-like master baths, finished on schedule with no shortcuts.

Licensed & Insured · 25+ Years of Experience · Free Estimates

A well-built bathroom is part daily routine, part retreat. Palm Beach Renovations remodels everything from tight powder rooms to spa-style master suites — curbless walk-in showers, freestanding tubs, double vanities, and tile work that holds up to Florida humidity. We manage the waterproofing, plumbing, and ventilation correctly the first time, so the beautiful finishes you see are backed by the work you don't.

Walk-in shower with white marble tile and black fixtures by Palm Beach Renovations
Marble bathroom with a rainfall shower and soaking tub by Palm Beach Renovations
Glass-enclosed shower with subway tile and a built-in bench by Palm Beach Renovations

No matter what day of the week, they always got back to me quickly, which gave me peace of mind throughout the process.

Mary G., Google Review

Great communication, always on time, no shortcuts, finished the job ahead of schedule and did a beautiful job!

Sharon P., Google Review

Why Homeowners in Palm Beach & Martin County Choose Us

Walk-In & Curbless Showers

Modern, accessible showers with proper slope, waterproofing, and tile detailing that lasts.

Vanities & Storage

Custom and semi-custom vanities sized to your space with the storage you actually need.

Moisture-Smart Builds

Correct waterproofing and ventilation to prevent the mold and rot common in humid climates.

Tile Craftsmanship

Floor-to-ceiling tile, niches, and accents installed with clean lines and lasting adhesion.

Our Process

  1. Free in-home consultation and measurements
  2. Design, fixture and tile selection, written estimate
  3. Demolition, waterproofing, plumbing, and electrical
  4. Tile, vanity, fixture, and glass installation
  5. Final walkthrough and cleanup

Frequently Asked Questions

How long does a bathroom remodel take?

A typical bathroom runs 2–4 weeks. Master suites with custom tile and glass can take longer; we'll give you an exact timeline before we start.

Can you make my shower accessible?

Yes — curbless entries, grab-bar blocking, benches, and handheld fixtures are all part of what we do.

Will you handle the plumbing and electrical?

Yes. We coordinate licensed trades so the entire job is done to code under one accountable team.

Ready to Start Your Bathroom Remodeling Project?

Get a free, no-pressure estimate.

Bathroom Remodeling by City